Right after the insulation went in, the sheet rock guys had their crew over stocking the sheet rock and putting it up! These pictures were taken on the second day, so they were finishing hanging everything and had started mudding. I am loving the vault ceiling so much now that it is sheet rocked. I was a little worried about size (everything seems to shrink a lot when you put up walls and close everything off) and it felt really dark (only the light from the room you are in, not from the whole house!), but that has passed.
Vault over the dining room and stairs, and regular ceiling in the kitchen
Pantry and open shelf above (Matt claims he will be putting a stuffed turkey there someday and I claim that is never going to happen)
Living room
Entry
Stairway where (unfortunately) Matt's elk "Spike" will hang
Hallway to bedrooms
Main bath for bedrooms
Bedroom 1 (bigger of the two bedrooms)
Bedroom 2
Linen closet in the hallway
Another view of the vault and living room
Laundry side of the mudroom
Benches/lockers side of the mudroom. Matt is giving me 100% control of the decision making in this space. I am so excited! Pinterest here I come!
Man-door in the garage
Master bedroom with tray ceiling, which I love!
Master bathroom. Seeing the shower framed in is so weird!
We are very excited for the progress as always! The mudding still needs another day and then they will texture the walls and ceiling. After that all dries, we can start hanging interior doors and putting up baseboard and trim on windows and doors. Then paint! I am starting to see light at the end of the tunnel- a very long and work-filled tunnel, but it's there!